PROJECT 02 / CASE STUDY
BIM & 4D Simulation / Industrial Infrastructure
Qingnian Road Substation.
A high-precision digital engineering model for substation infrastructure, coordinating site planning, equipment buildings, oil containment, fire-water facilities, lightning protection, and construction sequencing.
SCOPE / DELIVERY
Engineering
intent.
Site coordination, switchgear building, auxiliary facilities, fire pump house and water tank, oil containment basin, and lightning protection models.
- MODEL
- Revit + OpenBIM IFC asset set
- ASSETS
- 5 Revit models · 4 IFC exchanges
- FOCUS
- logistics · clashes · sequencing
- STATUS
- source models received
SOURCE SET: Qingnian Road Substation/*.rvt, *.ifc